Hoj–Potin Road Waterfall Section Reopens


KEYI PANYOR, August 29: 

The Waterfall (Jharna) section of the Hoj–Potin Road was officially reopened today, restoring vehicular connectivity along the important highway stretch.

The reopening was carried out by Team All Nyishi Students’ Union (ANSU) in the presence of the Chief Engineer (Highway), Executive Engineer (EE), Assistant Engineer (AE), Junior Engineer (JE) and the Managing Director of the concerned contractor.

The road had suffered damage following a flash flood on June 24, which affected several portions of highway stretches in Keyi Panyor district and disrupted vehicle movement for several days.

The damage had caused considerable inconvenience to commuters and residents who depend on the road for regular travel and transportation between the districts.

With the restoration of the Waterfall section, movement along the Hoj–Potin Road is expected to become smoother, providing relief to commuters and strengthening connectivity in the region.

The restored road will particularly benefit people travelling to and from Lower Subansiri, Upper Subansiri, Kamle, Kurung Kumey and Kra Daadi, besides other adjoining areas.

On behalf of Team ANSU and the people of the six districts, the union expressed its heartfelt gratitude to M/s Nabam Tulon LLP and the Highway Department for their tireless efforts towards the speedy restoration of the damaged road.

ANSU appreciated the prompt response and continuous efforts of the department and the contractor to restore connectivity at the earliest.

The reopening is being seen as a significant relief for the people and a positive step towards improving road connectivity across the region.

Popular posts from this blog

Takam Dado Renyo (D Renyo) Passes Away

Three Held for Mithun Theft in East Siang

Dr. Lige Basar, Three Others Killed in Assam Crash